Warming Hut — Winnipeg

Mar 30 • Architects, PLAY, WINNIPEG • 1463 Views • No Comments on Warming Hut — Winnipeg

Architect: Weiss Architecture and Urbanism Limited

Design Team: Weiss Architecture & Urbanism Limited – Kevin Weiss, Principal; Sophie Tremblay, Project Architect; Mina Hanna

Client: The Forks Renewal Corporation

Structural Engineer: Blackwell, David Bowick

Technical Advisor: Punch Clock Metal Works

Fabricator: Canada Culvert

Related Posts

« »